Isilon network

7 posts

Reassign Isilon node IP addresses; go OCD!

A while ago I installed two new Isilon H400 clusters. With any IT infrastructure, consistency and predictability is key to a trouble-free experience in the years to come. Cables should be neatly installed, labeled and predictable. Wiring in the internal network cables, it helps if the nodes 1 through 4 are connected to switch ports 1 through 4 in order, instead of 1,4,2,3. While some might consider this OCD, it’s the attention to detail that makes later troubleshooting easier and faster. Like a colleague said: “If someone pays enough attention to the little details, I can rest assured that he definitely pays attention to the big, important things!”.

So I installed the cluster, configured it, then ran an isi status to verify everything. Imagine my delight when I saw this:

Isilon nodes before reassigning node IPs

Aaargh!

Continue reading

Isilon node loses network connectivity after reboot

Isilon H400 chassis with serial cable attachedIn my previous post I described how to reformat an Isilon node if for some reason the cluster creation is defective. After we got our new Gen 6 clusters up and running, we ran into another peculiar issue: the Isilon nodes lose network connectivity after a reboot. If we would then unplug the network cable and move it to a different port on the Isilon node, the network would come online again. Move the cable back to the original port: connectivity OK. Reboot the node: “no carrier” on the interface, and no connectivity.

Continue reading

Isilon Tech Refresh – Replacing old NL400 Isilon nodes for NL410’s

Last month I’ve performed a Isilon tech refresh of two clusters running NL400 nodes. In both clusters, the old NL400 36TB nodes were replaced with 72TB NL410 nodes with some SSD capacity. First step in the whole process was the replacement of the Infiniband switches. Since the clusters were fairly old, an OneFS upgrade was also on the list, before the cluster could recognize the NL410 nodes. Dell EMC has extensive documentation on the whole OneFS upgrade process: check the support website, because there’s a lot of version dependencies. Finally, everything was prepared and I could begin with the actual Isilon tech refresh: getting the new Isilon nodes up and running, moving the data and removing the old nodes.

Continue reading

Safely replace an Isilon InfiniBand Switch with these steps

Isilon Infiniband switch 8 port MellanoxEvery once in a while you might need to replace an Isilon infiniband switch. Possibly because of a broken switch, the need for more ports, or because the old switch is.. too old. Good news: it’s a fairly straightforward job.  And if your cluster has two switches, you can replace a switch at a time without outage.

Continue reading

Isilon network modification via CLI

Isilon networkDid you ever install an Isilon cluster, connect all the cables and run through the configuration wizard, only to find out you still can’t connect to the cluster? Sure you did, happens to everyone. Maybe the cluster only has one 10GigE port online while the network team is still scrambling for 10GigE modules. Or maybe you have configured the invalid VLAN tag on the subnet. This post will group some of the more useful Isilon network commands, so you can enable VLAN tagging or add additional ports to the pool via the CLI.

Continue reading

Speed up Isilon DR – SmartConnect zone alias

These Isilon nodes need a firmware upgrade!Isilon scale-out NAS systems lean heavily on DNS. DNS plays a vital role in the way the clients access the files on the Isilon cluster: clients are distributed across nodes and network interfaces based on what your DNS reports back to the clients. This is all done by the SmartConnect component in the Isilon which is configurable up to a certain extent. In this post I’ll explain what SmartConnect does and will also share a tip to speed up your Isilon DR procedure.

Continue reading

Implementation Day 2 – Start the Isilon

You should see something like this after you start the isilonYesterday we racked and stacked the EMC Isilon systems, prepared most of the cabling and pretty much prepared to start the Isilon systems. Which is pretty uneventful if you consider we’ve been dragging along hundreds of kilograms of equipment all day yesterday… The whole process can be pretty much split in four parts: configure the cluster and initial node, join the remaining nodes, configure the network, configure the rest.

Continue reading